Related

"7.5 Ton Electric Chain Hoist"

Products
SSDHL7.5-03
2016-08-10

Email: sales@liftech-equipment.com

CDD
2016-08-10

Email: sales@liftech-equipment.com

Related

"7.5 Ton Electric Chain Hoist"

Blog
Crane 7.5 ton electric chain hoist machinery detailed management system
2014-11-01
                                       Taking into account the factors lifting many aspects , and in order to strengthen the management of client lifting machinery , lifting machinery to ensure proper operation and safety in production , so the devel...                                        Taking into account the factors lifting many aspects , and in order to strengthen the management of client lifting machinery , lifting machinery to ensure proper operation and safety in production , so the development of a series of management system. We can be grouped into nine points , one company should be based on the type, quantity and complexity of lifting machinery , the establishment of 7.5 ton electric chain hoist a full-time or part-time engineering and technical personnel in the device power management department is responsible for the management of lifting machinery . Second, lifting machinery workplace have sufficient lighting and lifting channels , and should be kept a safe distance from the provisions of the nearby equipment, buildings and electrical lines. Third, the use of units should establish the necessary lifting machinery repair and maintenance, periodic inspection , operating rules , safety rules and shift system. Fourth, one by one lifting machinery must be registered and create the device files. File should include the original technical data product certification, quality certificates , drawings , etc., as well as running records, previous technical inspection reports, overhaul , changing the original design performance and major accidents records. Five is dedicated lifting machinery to implement the system , each person responsible for lifting machinery must use management. Six is the operator of the lifting machinery used must be "four three will understand " ( understand performance , understand the structure , to understand the principles , understand purpose , uses , maintains and maintenance, will be troubleshooting ) . And specialized training , after obtaining the certification exam can only operate through the full department . Seven is the use of the unit for a major transformation of lifting machinery or change the original design performance , must come up with based on " Crane design specifications" transformation plan , design drawings, books and quality assurance measures to be taken , and by the competent authorities and the plant director or Chief Engineer approval , the local labor department. Eight is a new installation , after the overhaul or change the original design performance of lifting machinery must be set before using the static test and dynamic load tests and other technical inspection , after the device power management , security services and user departments to identify common acceptance, and before use by the competent director or chief engineer approval . Nine is the use of units should be regularly lifting machinery for technical inspection and testing , inspection and testing cycles and content execution by GB6067085 " crane safety regulations " requirement. If you can do the above, then you very well for Keiko lifting machinery management regulations , which will help you to work smoothly , and the formation of your business good cycle .                                     View Details
We need to do before 7.5 ton electric chain hoist using the hook six things
2014-01-21
                                       Hook in a variety of lifting equipment used in both , such as the main selling products on our website , " 7.5 ton electric chain hoist " above on the use of the hook , the hook is one of the crucial p...                                        Hook in a variety of lifting equipment used in both , such as the main selling products on our website , " 7.5 ton electric chain hoist " above on the use of the hook , the hook is one of the crucial parts chain hoists , are key parts of the device where the connection weights because lifting weights can secure a large part of that is part of the work done hook in place, today we focus on speaking about the details about the hooks :      1 , the hook should have to buy a new manufacturing unit certificates and other documents to prove the technology .      2 , should be a " crane safety regulations ," the use of the above requirements .      3 , before using it to make comprehensive and detailed examination hook , hook surfaces should be smooth , no glitches obvious defects , cracks , and other acute angle .      4 , to detect hook scrapped and replaced.      5 , should be equipped with a safety device against accidental decoupling on the hook .      6 , can not remember the hook welding defects .                                     View Details
Assessment outlined in 7.5 ton electric chain hoist the original machinery and equipment p
2014-01-21
                                       In the industry , machinery and equipment is just a collectively. It includes a variety , a production machinery equipment , non-production machinery equipment and rental equipment. I sold the company which is 7...                                        In the industry , machinery and equipment is just a collectively. It includes a variety , a production machinery equipment , non-production machinery equipment and rental equipment. I sold the company which is 7.5 ton electric chain hoist the production chain hoists lifting equipment class class of a product, in leasing machinery and equipment assessed valuation may appear in machinery and equipment , to introduce today is about assessing the contents of a finance lease of machinery and equipment in the original value, we analyze together : Was the original value of the machinery or the original value is also called , is an enterprise acquisition, construction , and other ways to obtain all the money spending a mechanical device that occurred at that time , including construction costs, purchase price, transport fees, construction and installation costs. Due to the different sources of machinery and equipment , which are not the same as the original value .      1, with capital construction funding or borrowing to build infrastructure machinery and equipment, construction of a production unit to its original value breakdown in the delivery of the property value determined ;      2, with special grants , special funds and special loan to build their own machinery and equipment, construction of its original value , all costs incurred during installation or purchased .      3 , on the basis of the original machinery and equipment for technological transformation, the original value of their original price of machinery and equipment , less Bianjiashouru transformation process occurs , coupled with the increase in expenditure due to the transformation .      4 , by other units of machinery and equipment transferred free of charge , to its original price of the book is to bring up the original price minus the original unit installation costs , installation costs transferred units joined occur .      5 , paid by other units transferred machinery and equipment, its original price is the current price or provoke agreement plus pay packing, transportation, and installation costs.      6, in the newly discovered property inventory of machinery and equipment , machinery and equipment for similar estimate its original value. Calculate the original value of machinery and equipment , mechanical equipment should reflect changes in beneficial changes and wear and tear during use , while also reflecting the company's production capacity and scale.                                     View Details
The tonnage of MG type 7.5 ton electric chain hoist double girder gantry crane and span
2014-01-20
                                       MHh type electric hoist gantry crane used together with CD1, MD1 model electric hoist, is a street of the small and 7.5 ton electric chain hoist medium-sized crane operation, its applicable lifting weight 5-32 t...                                        MHh type electric hoist gantry crane used together with CD1, MD1 model electric hoist, is a street of the small and 7.5 ton electric chain hoist medium-sized crane operation, its applicable lifting weight 5-32 tons, applicable span 12 to 30 meters, the work environment - 20 ℃ ~ + 40 ℃. This product is a regular crane, widely used at open ground and warehouses to load and unload or grab materials, this product has two type ground controlling and room controlling. MG type double girder gantry crane by the bridge, cart running device, cars, and other components of the electrical equipment, bridge with box type double beam welding structure, supporting mechanism driven by respectively, all its institutions were in operation room. Double beam gantry crane conductive formation is divided into slide wire and cable, users can choose any one. The normal use of the crane system environment should be in the 25 ℃ to + 40 ℃, the average temperature of the 24 hours must not exceed + 35 ℃, other installation makes the height is not more than 2000 meters above sea level, where more than 1000 meters to motor capacity for checking. MG type double girder gantry crane tonnage 5 t, 8 t, 10 t, 12.5 t, all span; T, tonnage 16/32 span 18 m, 22 m, 26 m; Tonnage 20/5 t, 18 m span, 22 m. MG type double beam hook gantry crane is suitable for outdoor warehouse, railway freight station yard, port handling, etc. Also can match with a variety of special hook with a variety of special operations.                                     View Details
Lay and wire 7.5 ton electric chain hoist rope core code tags
2014-01-20
                                       Wire rope according to twist around different methods can be divided into the right or left concurrent twist direction 7.5 ton electric chain hoist interaction of twist twist, left or right interactive twist, st...                                        Wire rope according to twist around different methods can be divided into the right or left concurrent twist direction 7.5 ton electric chain hoist interaction of twist twist, left or right interactive twist, steel wire rope (or shares) lay, refers to the shares in the rope (or silk) in the stock of spiral twist direction. Methods: place the rope (or shares) vertical observation, if stocks (silk) spiral direction is from left to the upper right, then to the left twist, according to the direction of twist system with two letters or S (Z) said wire rope lay, lay the second letter said shares, said "Z" twist to the right, said the "S" twist to the left. According to the shares, rope twist direction, steel wire rope can be divided into: A right interaction twist ZS: rope twisting right and left stranding twist direction and shares in wire twist twist in the opposite direction said interaction B left interaction twist SZ: rope twisting left and right twist C right concurrent twist ZZ: rope twisting right, stock right twist D left concurrent twist: rope twist on the left, left twist E right mixed twist: rope twist, right part left twist, part of the stock right twist F left mixed twist: rope left twist, part of the stock right twist, parts stock left twist                                     View Details